89648

petro-chemical plant

(Petro) Chemical industry

Safety first in all circumstances

 From traditional fossil fuel power plants to chemical plants;  reliable and safe installations are first priority 
 

In the effort  to continuously improve efficiency, reduce cost and improve the product performance, one should never neglect the safety of the plant.  

Under the condition of safety first , your installation should also: 

  • Be designed so that modifications can be done  in every situation  (both underground and above the surface)  
  • Ease inspection and cleaning of the installation 
  • Minimize as much as possible  unforeseen maintenance stops due to malfunction  
  • Upon first set up be installed quickly and efficiently  

The nature of these installations require strong and robust solutions and Legrand has just that. 
 

Industrial petro-chemical plant

Our offer for the (Petro-) Chemical industry